Kunwu Heavy Request a Quote

Large Part CNC Machining — Boring, Milling and Turning up to 2800 mm

Most of the machining we do is on parts that have already been welded. That is the harder problem, and it is the reason customers send us the whole job instead of splitting it.

Five-axis double-swivel milling head with a tool loaded

Capability

ParameterValueNote
Max workpiece length2800 mmGantry mill
Max workpiece width1600 mm—
Max workpiece height800 mm—
Max workpiece weight4 tGoverned by crane capacity (5 t × 0.8)
Max boring diameter260 mmBoring heads on the gantry centres
Turning: max swing × length2000 × 1200 mm—
Positional tolerance, hole to hole±0.5 mmMeasured on CMM
Flatness0.10 mm/m—
Surface roughnessRa 6.3 – Ra 1.6—
General tolerancesISO 2768-mUnless the drawing states otherwise
Machining after weldingYesStress relief before final machining
Typical lead time25 daysFor this class of part
Tolerances and quality levels

How we hold position on a welded part

A weldment moves. Heat goes in unevenly, and the part relaxes over the following days. So we stress-relieve first, then set up once, indicate off the datum features on the drawing rather than off a welded edge, and machine everything in that one setup. Where a customer has given us a datum that moves, we say so before we start rather than after.

Every new part number gets a first-article dimensional report. Full CMM reports are available on request.

Choosing a datum on a welded part Diagram contrasting a datum taken from a welded edge, which moves, with a datum taken from a machined base, which does not. WHERE THE DATUM COMES FROM Same part, same machine, two different results. Datum on a welded edge moves as the weldment relaxes — holes drift Datum on a machined base stable — hole position held to ±0.5 mm
Datum on a welded edge versus a machined base.

Frequently asked

Can you machine a welded frame after welding, or do we need a separate machine shop?
Yes, and it is what we prefer. We stress-relieve the weldment first, then finish-machine it in one setup on our 2800 mm gantry. Typical hole-position tolerance after welding is ±0.5 mm.
What is the largest part you can machine?
2800 × 1600 × 800 mm, up to 4 t per piece. Above that we can sometimes machine in stages, but tell us early — it changes the price and the tolerance we can promise.
Do you provide a dimensional report?
Yes. A first-article dimensional report is included with every new part number at no extra charge. Full CMM reports on production quantities are available on request.
What tolerance can you actually hold on a large welded part?
±0.5 mm on hole position and 0.10 mm/m on flatness, provided the drawing gives us a machined datum rather than a welded one. If your drawing references a welded edge, we will ask to change it.
Can you machine parts we send you, without doing the welding?
Yes, but tell us the weld history — whether it has been stress-relieved, and how long ago it was welded. A weldment that arrives three days after welding will not hold the same tolerance as one that has been relieved and allowed to settle.
What CAD formats do you accept?
STEP, IGES, DWG, DXF, SolidWorks and PDF. Send a 2D drawing with tolerances even if you also send 3D — the model does not tell us which features matter.
Case studies

Project pages are being prepared. If you want to see comparable work now, ask and we will send the relevant dimensional reports and photographs under NDA.

Send us the drawing

Acknowledgement within 4 working hours. Full quotation within 48 hours when the drawing package is complete.

Email Your DrawingCan We Make It?