Kunwu Heavy Request a Quote

From Plate to Machined Assembly, Without Changing Suppliers

Most heavy fabricated parts pass through three companies before they reach you. One cuts the plate. Another welds it. A third machines the mounting faces and bores the holes. Every handover is a new setup, a new datum, and a new opinion about whose fault it is when the bore is 0.4 mm out.

We do all three.

Three suppliers versus one plant Comparison showing that splitting a weldment across three shops means two handovers and three datum setups, while doing it in one plant means none and one. THE USUAL WAY — THREE SUPPLIERS Cutting shop plate in, blanks out datum set transit 5–10 d Welding shop assembles, then ships datum set transit 5–10 d Machine shop re-clamps, re-datums datum set ONE PLANT Cut · Form Weld · Stress relieve Finish machine datum set once Handovers 2→0 Datum setups 3→1 Days in transit 5–10→0 Responsible party 3→1
Two handovers and three datum setups, against none and one.

What that actually changes

Three suppliersOne plant
Handovers between shops20
Times the part is re-datumed31
Extra time in transit between shops5–10 days0
Who is responsible when a bore is out of positionDiscussedUs
Who pays for the reworkArguedUs

The tolerance you can hold on a welded assembly is not set by the machine. It is set by how many times the part has been picked up, clamped and re-referenced. Cutting that number from three to one is worth more than a better machine.

The sequence

Plate arrives with its mill certificate and its heat number. It is cut and bevelled, formed, then welded to a qualified procedure. The weldment is stress-relieved before anything is machined — not after, which is the mistake that puts a good part out of tolerance three weeks later. Then it goes onto the gantry, is set up once, and comes off with the mounting faces, bores and threads finished.

It is inspected, coated, crated and photographed before the lid goes on.

The envelope

Max weldment size12000 × 4000 × 3500 mm
Max piece weight4 t (limited by our 5 t crane)
Max plate thickness80 mm
Machining envelope after welding2800 × 1600 × 800 mm
Hole position tolerance after welding±0.5 mm
Flatness0.10 mm/m
Stress relief furnaceIn-house — cycle charts supplied with the job

Check your part against this

Tolerances and quality levels

What we don't do

We would rather tell you now than after you've sent the drawings.

Send us the drawing

Acknowledgement within 4 working hours. Full quotation within 48 hours when the drawing package is complete.

Email Your DrawingCan We Make It?