Kunwu Heavy Request a Quote

Heavy Weldment Fabrication — Welded to Procedure, Machined After

We build weldments up to 4 tonnes in carbon, low-alloy and wear-resistant steel, and we finish-machine them in the same plant. Welding is done to qualified procedures with recorded parameters, not to whatever the welder is used to.

Welding bays behind red screens in the fabrication hall, welder at work

Capability

ParameterValueNote
Max weldment size12000 × 4000 × 3500 mm—
Max piece weight4 tLimited by crane capacity
Crane capacity5 t × 2Single-girder EOT
ProcessesMIG/MAG (135/136), TIG (141), SMAW (111), SAW (121), roboticISO 4063
Max plate thickness welded80 mmMulti-pass MAG / SAW
Welder qualificationEN ISO 9606-1Certificates travel with the job
Welding proceduresQualified WPS with PQRsEN ISO 15614
Weld quality levelISO 5817 Level CLevel B where specified
Dimensional tolerancesISO 13920 Class BTighter class on request
Stress reliefIn-house furnace, thermal cycle charts supplied—
NDT in-houseVT, UT, MTThird-party inspection on request
Tolerances and quality levels

Distortion control

On a large weldment, distortion is a scheduling problem before it is a welding problem. We sequence the welds so the part pulls against itself, control interpass temperature on the alloy and wear grades, and stress-relieve before any machining.

Where a customer's design makes distortion unavoidable, we say so at quotation stage and propose a change — we would rather argue about it on a drawing than on a finished part.

Process chain from plate to packed part Eight stages: plate, cutting, forming, welding, stress relief, machining, coating and packing, all performed in one plant. FROM PLATE TO PACKED PART Every stage below happens inside the same plant. Plate mill cert + heat no. 01 Cutting laser / plasma / flame 02 Forming press brake / rolling 03 Welding to qualified WPS 04 Stress relief before machining 05 Machining one setup, one datum 06 Coating blast + paint 07 Packing fumigated crate 08 The part is referenced once, at stage 06. Stress relief comes before machining, not after.
Where welding sits in the sequence, and why stress relief comes before machining.

Frequently asked

Do you have welding procedure qualifications?
Yes — qualified WPS with supporting PQRs to EN ISO 15614. We can send the relevant WPS with the quotation.
Can you weld wear plate without losing hardness?
Yes, with preheat and heat-input control appropriate to the grade and thickness. We do not weld across a wear face where the design allows the joint to be moved — and we will suggest that change if we see it.
What weld quality level do you work to?
ISO 5817 Level C as standard. Level B where the drawing specifies it, which changes the NDT scope and the price — tell us at enquiry stage.
Do you do NDT in-house or subcontract it?
Visual, ultrasonic and magnetic particle testing in-house. Radiography and third-party inspection by SGS, TÜV, BV or your own inspector are arranged on request.
Case studies

Project pages are being prepared. If you want to see comparable work now, ask and we will send the relevant dimensional reports and photographs under NDA.

Send us the drawing

Acknowledgement within 4 working hours. Full quotation within 48 hours when the drawing package is complete.

Email Your DrawingCan We Make It?