What We Measure, With What, and What You Receive
Inspection is not a department that catches mistakes at the end. Most of what follows happens while the part is still on the machine.
Three stages
Incoming — Grade, heat number, dimensions, mill certificate and melt-and-pour origin recorded against the job number before the plate is cut.
In process — First article on every new part number. Cut dimensions, hole size and position, bend angles, weld visual inspection, and machined dimensions checked at setup and at completion.
Final — Dimensional report, visual inspection, material certificate, welding and heat treatment records, coating thickness, and a packing check with photographs.
- Thermal cutting to ISO 9013 Range 2 as standard.
- Weldment dimensional tolerances to ISO 13920 Class B as standard, a tighter class on request.
- Weld quality to ISO 5817 Level C as standard, Level B where the drawing specifies it.
- Machined features to ISO 2768-m unless the drawing states otherwise.
- Surface preparation to ISO 8501-1 Sa 2½, coating systems to ISO 12944 up to C4.
Inspection equipment
| Capability | Equipment | Range / accuracy |
|---|---|---|
| Ultrasonic weld testing | Digital A-scan flaw detectors | Structural welds, scope per the ITP |
| Magnetic particle | AC yoke sets | Surface checks on prepared welds |
| Dimensional | Laser level, large micrometers, verniers, squares | To drawing, ISO 2768-m |
| Coating thickness | Digital DFT gauges | 160-320 um systems |
| Ultrasonic thickness | Corrosion-survey gauges | Plate verification |
| Hardness | Portable Leeb tester | Wear-plate verification |
SGS, TÜV, BV, Intertek, DNV or your own inspector can be arranged. Tell us at order stage so we can build the hold points into the schedule — adding an inspection point after production has started costs everyone time.
Every shipment leaves with the paperwork trail: EN 10204 3.1 mill certificates, documented melt-and-pour origin, welding records, a first-article dimensional report, and the coating and packing record.
Send us the drawing
Acknowledgement within 4 working hours. Full quotation within 48 hours when the drawing package is complete.