Heavy Machinery and Lifting Equipment Components
On this work the whole job is the tolerance after welding. A frame that measures correctly the day it is welded and moves the following month is a warranty claim.

What we make for this sector
- Machine frames and bases, stress-relieved then finish-machined in one setup
- Gearbox and drive housings with machined bores and mounting faces
- Boom, jib and mast sections in high-strength steel
- Slew and bearing supports
- Fabricated assemblies supplied to an OEM as part of a machine
Crane and lifting structures normally follow the Machinery Directive route rather than the Construction Products Regulation. If your part is a load-bearing component of a building or civil work, tell us — that requires EN 1090 CE marking and our certification is still in progress.
Project pages are being prepared. If you want to see comparable work now, ask and we will send the relevant dimensional reports and photographs under NDA.
Send us the drawing
Acknowledgement within 4 working hours. Full quotation within 48 hours when the drawing package is complete.